Royal Sakti ◆ The Programme for Young Directors
Prepared by Dewi Sakti, CEO of Royal Sakti
00 / 10
Ready
Royal Sakti Group leadership and partners poster
Leadership & Partners · Training for Young Directors™ · tap to enlarge
Royal Sakti Strategic Advisory · Leadership programme

The Programme for Young Directors

Build people who can build systems. Build systems that can sustain people. A director-level programme in strategy, governance, value, risk and stakeholder leadership, taught through the same portfolio discipline Royal Sakti uses on megaprojects.

5Modules
35Competencies
680Practice questions
1Boardroom case
Royal Sakti Strategic Advisory · The Programme for Young Directors · 2026 intake

Young Directors

Dewi Sakti
Founder-led leadership programme · 20 partners · 10 portfolios · 2 partners each
Designed and led by Dewi Sakti, CEO of Royal Sakti Strategic Advisory
IDENTIFY · PRESENT · DECIDE · LEAD
The Zuhud Partner Standard™Strategy · Governance · Value · Risk · StakeholdersWorked board-level calculations🔊 Audio narration3 full Director AssessmentsBoardroom case: Project A
Your path through the programme

Five modules

Programme blueprint

Five modules. Thirty-five director competencies. One standard.

Young Directors learn to think and decide at portfolio level: which work deserves capital, who decides, how value is proven, how risk is carried and how stakeholders are brought along. Each module ends with practice questions, worked calculations and audio, and the programme closes with a timed Director Assessment and a live Boardroom Case.

ModuleWeightCompetenciesWhat a director must be able to do
Module 1 · Strategy & Alignment25%8Set direction, choose what to fund, and change course when strategy moves
Module 2 · Governance & Board Decisions20%5Make, record and defend decisions inside clear authority
Module 3 · Performance & Value Delivery25%10Turn approved investment into measured value and benefits
Module 4 · Risk & Capital Protection15%6Protect capital: appetite, dependencies, reserves and ownership
Module 5 · Stakeholders & Communication15%6Win and keep the support of boards, regulators and teams
Total100%35
5Modules
35Competencies
170Module questions
510Assessment questions
240Minutes per assessment

Who it is for

Emerging leaders preparing to take a portfolio, a business unit or a board seat inside the Royal Sakti ecosystem. The proposed model has 20 leadership partners across ten portfolios, two per portfolio: one leads strategic opportunity, markets and partnerships; the other leads financial viability, implementation and risk.

The Zuhud Partner Standard™

Ihsan, integrity, evidence, capital stewardship, selfless leadership and accountability. Partners own their direction within delegated authority and make decisions rather than escalate routine work to the founder.

The director's journey

  1. Identify. Read the strategy, find where resources fail to become outcomes, and frame the opportunity (Module 1).
  2. Present. Build an evidence-based recommendation with options, trade-offs and numbers the board can check (Modules 1 and 3).
  3. Decide. Know whose decision it is, take it inside your authority and record it (Module 2).
  4. Lead. Deliver the value, carry the risk and keep stakeholders with you (Modules 3, 4 and 5).

The 35 competencies and practice questions

Module 1 · Strategy & Alignment
  1. 1.1 Evaluate strategic goals and objectives 5 questions
  2. 1.2 Identify prioritization criteria 4 questions
  3. 1.3 Rank strategic priorities 5 questions
  4. 1.4 Identify portfolio components 4 questions
  5. 1.5 Create portfolio scenarios (what-if) 10 questions
  6. 1.6 Recommend scenarios and components 6 questions
  7. 1.7 Determine impact of strategic change 4 questions
  8. 1.8 Create the high-level roadmap 4 questions
Module 2 · Governance & Board Decisions
  1. 2.1 Define and establish the governance model 6 questions
  2. 2.2 Determine standards, protocols and best practices 6 questions
  3. 2.3 Define and modify portfolio processes 7 questions
  4. 2.4 Create the portfolio management plan 7 questions
  5. 2.5 Recommend and obtain approval for decisions 8 questions
Module 3 · Performance & Value Delivery
  1. 3.1 Initiate the portfolio 3 questions
  2. 3.2 Collect and consolidate KPI data 6 questions
  3. 3.3 Monitor portfolio performance 7 questions
  4. 3.4 Manage and escalate issues 5 questions
  5. 3.5 Manage portfolio changes 3 questions
  6. 3.6 Balance and prioritize components 3 questions
  7. 3.7 Optimize capacity allocation 5 questions
  8. 3.8 Update and refine the roadmap 3 questions
  9. 3.9 Measure aggregated performance 5 questions
  10. 3.10 Maintain records 3 questions
Module 4 · Risk & Capital Protection
  1. 4.1 Determine acceptable level of risk 5 questions
  2. 4.2 Develop the risk management plan 3 questions
  3. 4.3 Perform dependency analysis 3 questions
  4. 4.4 Maintain the portfolio risk register 8 questions
  5. 4.5 Promote risk ownership 3 questions
  6. 4.6 Recommend the management reserve 4 questions
Module 5 · Stakeholders & Communication
  1. 5.1 Analyze stakeholders 4 questions
  2. 5.2 Create the communication strategy and plan 5 questions
  3. 5.3 Engage stakeholders 4 questions
  4. 5.4 Maintain the communication plan 5 questions
  5. 5.5 Facilitate understanding of processes 4 questions
  6. 5.6 Verify accuracy of communications 3 questions

How to study

  1. Open a module and read the study hints, director notes and cheatsheet.
  2. Press ⏱ 85s on each question to practise board pace, then check the worked explanation.
  3. Use 🔊 Listen or 🎧 Q + Answer to learn on the move.
  4. Track your band per module in My Progress.
  5. Sit a full Director Assessment, then work the Boardroom Case.

Completing the programme

Reach Target or better in every module on a Director Assessment, then present the Project A Boardroom Case recommendation. Progression to state-based CEO roles depends on demonstrated capability and commercial results; neither appointment nor equity is automatic.

Module 1 · 25% of the assessment · 8 competencies

Module 1 · Strategy & Alignment · 42 Questions

8 calculation and 34 non-calculation questions, in competency order. Start the 85-second timer (board pace), choose your answer, then check the explanation. Calculation answers show every step of the working.

Situational flowSee every Module 1 formula applied to one board decision: Project A’s USD 11M forecast loss.
Study hints · director focus

What a young director must master in Module 1

  • Know the three planning outputs of strategic alignment: the portfolio strategic plan, the portfolio charter and the portfolio roadmap, and what each one contains.
  • The strategic plan links organizational strategy to the portfolio; the charter authorizes the portfolio manager and structure; the roadmap shows components, dependencies and milestones over time.
  • Prioritization is driven by an agreed scoring model. Expect questions on who sets criteria (governance and key stakeholders) and why they must trace to strategy.
  • Scenario analysis plus capability and capacity analysis test which component mix is feasible, not just attractive.
  • Managing strategic change uses gap analysis (current versus desired state) and readiness analysis (can we make the shift?). Sunk cost never justifies continuing misaligned work.

Written for the programme from The Standard for Portfolio Management and Royal Sakti practice.

Director notes · at a glance

Module 1: what to remember

Must know

  • Portfolio. Projects, programs, operations and sub-portfolios managed together to achieve strategic objectives.
  • The flow. Strategy → objectives → criteria → identify components → categorise → score → scenarios → recommend → governance approves → roadmap.
  • Strategic plan vs roadmap. The plan turns strategy into portfolio objectives. The roadmap shows timing, sequence and dependencies.
  • Prioritisation criteria. Strategic fit, value (NPV, ROI, BCR), risk, mandatory or regulatory need, dependencies, resource demand.
  • Scenario (what-if) analysis. Tests different component mixes against budget, capacity and risk appetite.
  • Efficient frontier. The mixes that give the highest return for each level of risk.
  • Strategy changes. Analyse the impact first, then rebalance. Sunk cost never decides.

Boardroom traps · the right instinct

  • IfWho decides?→ The portfolio manager recommends. Governance approves.
  • If“What FIRST?”→ Usually: understand the strategy, or analyse the impact.
  • IfCompliance project ranks last→ Mandatory work is not ranked away. Fund it or fast-track it.
  • IfNPV vs IRR vs payback→ For either/or choices, the highest positive NPV wins.
  • IfBiggest single score→ The weighted total decides, not one criterion.
NPV = Σ PV(inflows) − investmentPV = FV ÷ (1 + r)ⁿROI = (Benefit − Cost) ÷ CostBCR = PV benefits ÷ PV costsWeighted score = Σ (weight × score)Opportunity cost = value of the best option given up

Applied · as a Young Director

  • Strategy → criteriaYour portfolio's annual goals from the founder become the scoring criteria: strategic fit, cash, effort and risk. Score every proposal on them before you ask for money.
  • Scenario analysisTwo partners, one budget: compare a new state office, a digital product and a training contract. Recommend the mix with the most value your team can actually deliver.
  • RoadmapQuarter 1 Position → Quarter 2 Pilot → Quarter 3 Scale. The pilot comes before the scale-up, because scale depends on proof (a dependency).
  • Strategy changesWhen the group strategy shifts, re-score every initiative in your portfolio and stop low-fit work, whatever was already spent on it.
Cheatsheet · one image to remember

Module 1 cheatsheet

Module 1 cheatsheet
ZoomHeight

Drag the picture to choose which part shows. Use zoom and height, then Save.

Module 1 · Competency 1.1 · Evaluate strategic goals and objectivesQ1
Non-calculation

A newly appointed portfolio manager is asked to build the organization's first portfolio. What should the portfolio manager do FIRST?

Module 1 · Competency 1.1 · Evaluate strategic goals and objectivesQ2
Non-calculation

While reviewing the strategic plan, the portfolio manager finds that two executive objectives conflict: maximizing short-term margin and doubling R&D investment. What is the BEST action?

Module 1 · Competency 1.1 · Evaluate strategic goals and objectivesQ3
Non-calculation

Which source is MOST useful for understanding an organization's long-term strategic intent when building a portfolio?

Module 1 · Competency 1.1 · Evaluate strategic goals and objectivesQ4
Non-calculation

An executive tells the portfolio manager, 'Our strategy is in my head; just fund what I say.' How should the portfolio manager respond?

Module 1 · Competency 1.1 · Evaluate strategic goals and objectivesQ5
Non-calculation

The portfolio manager is evaluating strategic objectives. Which characteristic makes an objective MOST usable for portfolio decisions?

Module 1 · Competency 1.2 · Identify prioritization criteriaQ6
Non-calculation

When defining prioritization criteria, which group should the portfolio manager MOST involve?

Module 1 · Competency 1.2 · Identify prioritization criteriaQ7
Non-calculation

A portfolio uses only ROI to prioritize components. A legally mandated compliance project ranks last and is not funded. What is the ROOT problem?

Module 1 · Competency 1.2 · Identify prioritization criteriaQ8
Non-calculation

Stakeholders cannot agree on how much each prioritization criterion should weigh. Which technique is MOST appropriate?

Module 1 · Competency 1.2 · Identify prioritization criteriaQ9
Non-calculation

Two components score the same on the weighted model. One is a prerequisite for three other high-priority components. How should this affect prioritization?

Module 1 · Competency 1.3 · Rank strategic prioritiesQ10
Non-calculation

The portfolio manager has gathered the strategic objectives and the criteria. What is the NEXT step in Strategic Alignment?

Module 1 · Competency 1.3 · Rank strategic prioritiesQ11
Non-calculation

Executives rank 'customer experience' first and 'cost reduction' second. A new component scores high on cost reduction but slightly lowers customer experience. What should the portfolio manager do?

Module 1 · Competency 1.3 · Rank strategic prioritiesQ12
Non-calculation

Which output from ranking strategic priorities is MOST important for later portfolio activities?

Module 1 · Competency 1.3 · Rank strategic prioritiesQ13
Non-calculation

During priority ranking, a powerful executive pushes their division's goal to the top regardless of the data. What is the BEST approach?

Module 1 · Competency 1.3 · Rank strategic prioritiesQ14
Calculation · Weighted scoring model

The portfolio's scoring model weights Strategic Fit at 50%, Financial Return at 30% and Risk (higher score = lower risk) at 20%. Scores out of 10 are: W (7, 7, 7), X (8, 6, 5), Y (6, 9, 7), Z (9, 5, 4). Which component ranks FIRST?

Module 1 · Competency 1.4 · Identify portfolio componentsQ15
Non-calculation

While identifying portfolio components, the portfolio manager finds many small, unregistered 'shadow' projects in business units. What should be done?

Module 1 · Competency 1.4 · Identify portfolio componentsQ16
Non-calculation

Which of these is NOT normally considered a portfolio component?

Module 1 · Competency 1.4 · Identify portfolio componentsQ17
Non-calculation

What is the PRIMARY purpose of categorizing portfolio components (for example run/grow/transform, or by strategic objective)?

Module 1 · Competency 1.4 · Identify portfolio componentsQ18
Non-calculation

A business unit submits a component proposal with no business case. What should the portfolio manager do?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q19
Non-calculation

The portfolio manager has a scored list of candidate components. What is the PURPOSE of creating portfolio scenarios?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q20
Non-calculation

In what-if analysis, Scenario 1 maximizes NPV but uses 130% of the specialist capacity. Scenario 2 has a slightly lower NPV and uses 95%. What is the BEST interpretation?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q21
Non-calculation

Which tool BEST shows the trade-off between total portfolio return and total portfolio risk across scenarios?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q22
Non-calculation

During scenario development, a sponsor asks that their component be 'locked in' to every scenario. When is this appropriate?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q23
Non-calculation

What should be done with scenarios that turn out NOT to be viable?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q24
Calculation · NPV selection

A portfolio manager must choose ONE of two components for the next funding cycle. The organization's discount rate is 10%. Component A needs $500,000 up front and returns $200,000 a year for 3 years. Component B needs $300,000 up front and returns $130,000 a year for 3 years. Using NPV, which component should be recommended?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q25
Calculation · Payback period

A transformation component costs $900,000. Its expected net inflows are $200,000 in Year 1, $300,000 in Year 2, $250,000 in Year 3 and $400,000 in Year 4. Assuming inflows are spread evenly within each year, what is the payback period?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q26
Calculation · ROI

A completed program delivered total measured benefits of $1.8 million against a total cost of $1.2 million. What return on investment (ROI) should be reported to the portfolio review board?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q27
Calculation · Capital-constrained selection

The portfolio has a capital ceiling of $10M this cycle. Candidates (cost / NPV): A $6M / $4.0M; B $4M / $3.0M; C $5M / $3.5M; D $3M / $1.5M. Components cannot be partially funded. Which combination maximizes total NPV within the ceiling?

Module 1 · Competency 1.5 · Create portfolio scenarios (what-if)Q28
Calculation · Present value

A strategic initiative is expected to deliver a single benefit of $1,000,000 three years from now. The organization's cost of capital is 8%. What is the present value of this benefit, to the nearest dollar?

Module 1 · Competency 1.6 · Recommend scenarios and componentsQ29
Non-calculation

After scenario analysis, what should the portfolio manager present to the governance body?

Module 1 · Competency 1.6 · Recommend scenarios and componentsQ30
Non-calculation

The governance board rejects the recommended scenario and picks one the analysis rated lower. What should the portfolio manager do?

Module 1 · Competency 1.6 · Recommend scenarios and componentsQ31
Non-calculation

Which BEST describes the portfolio manager's role in selecting components?

Module 1 · Competency 1.6 · Recommend scenarios and componentsQ32
Non-calculation

A recommendation package should MOST include which of the following?

Module 1 · Competency 1.6 · Recommend scenarios and componentsQ33
Calculation · Benefit-cost ratio

Four proposed components show these present values (benefits / costs): A $2.4M / $1.6M; B $3.0M / $2.5M; C $1.4M / $0.8M; D $0.9M / $1.0M. Based only on the benefit-cost ratio (BCR), which component is MOST attractive?

Module 1 · Competency 1.6 · Recommend scenarios and componentsQ34
Calculation · Opportunity cost

The portfolio board can fund only one of three mutually exclusive components with NPVs of $5.0M (X), $3.2M (Y) and $2.1M (Z). It selects X. What is the opportunity cost of this decision?

Module 1 · Competency 1.7 · Determine impact of strategic changeQ35
Non-calculation

The organization changes strategy mid-year to focus on digital channels. What should the portfolio manager do FIRST?

Module 1 · Competency 1.7 · Determine impact of strategic changeQ36
Non-calculation

After analysing a strategic shift, the portfolio manager finds that a component 60% complete no longer aligns. What is the BEST recommendation?

Module 1 · Competency 1.7 · Determine impact of strategic changeQ37
Non-calculation

A competitor's product launch changes market conditions. How does this relate to the portfolio?

Module 1 · Competency 1.7 · Determine impact of strategic changeQ38
Non-calculation

Which artifact should be updated FIRST after a strategic change is approved?

Module 1 · Competency 1.8 · Create the high-level roadmapQ39
Non-calculation

What is the PRIMARY purpose of the high-level portfolio roadmap?

Module 1 · Competency 1.8 · Create the high-level roadmapQ40
Non-calculation

The portfolio manager is drafting the roadmap. Who should be involved?

Module 1 · Competency 1.8 · Create the high-level roadmapQ41
Non-calculation

Two components on the roadmap both need the same scarce platform team in Q3. What should the roadmap reflect?

Module 1 · Competency 1.8 · Create the high-level roadmapQ42
Non-calculation

How often should the portfolio roadmap be updated?

Module 2 · 20% of the assessment · 5 competencies

Module 2 · Governance & Board Decisions · 34 Questions

5 calculation and 29 non-calculation questions, in competency order. Start the 85-second timer (board pace), choose your answer, then check the explanation. Calculation answers show every step of the working.

Situational flowSee every Module 2 formula applied to one board decision: Project A’s USD 11M forecast loss.
Study hints · director focus

What a young director must master in Module 2

  • Portfolio governance decides what to invest in; the portfolio manager analyses and recommends. In the boardroom, the portfolio leader rarely decides alone.
  • The portfolio management plan describes how the portfolio is governed and managed: governance model, oversight, change control, balancing, prioritization model, compliance and subsidiary plans (risk, communications, performance, procurement).
  • Elicitation techniques such as facilitated workshops, interviews and surveys build the plan with the people who must follow it.
  • Decision thresholds and escalation paths are tested often. Read the numbers carefully and route to the authority named in the model.
  • Standards and processes should be tailored, integrated with existing organizational processes and improved through governance, never changed quietly.

Written for the programme from The Standard for Portfolio Management and Royal Sakti practice.

Director notes · at a glance

Module 2: what to remember

Must know

  • Governance. The framework of roles, decision rights and processes that guides portfolio decisions.
  • Governance body. Portfolio review board or steering committee. It approves, funds and authorises.
  • Portfolio management plan. Roles, thresholds, tolerances, escalation paths, KPIs, and the benefits, risk, change and communication processes.
  • Stage gate. A decision point: continue, change, hold or terminate.
  • Standards & protocols. Built from organisational process assets so data is consistent and comparable.
  • Authorisation. Formally releases funding and resources so a component can start.
  • Records. Every decision is documented with its rationale.

Boardroom traps · the right instinct

  • IfFast but bypasses governance→ Wrong answer, every time.
  • IfChange beyond threshold→ Escalate to whoever holds the decision rights. Do not approve it yourself.
  • IfProcess ignored→ Find the root cause (too heavy? unclear?) before enforcing.
  • IfFunded at 70%→ Re-scope or re-phase to fit what was approved.
  • IfManagement reserve→ Controlled by governance, not by component managers.
Available = Budget − Reserve − CommittedChange % = Change ÷ Approved budgetGate % = Weighted score ÷ Max scoreAllocation = Weight × Pool

Applied · as a Young Director

  • Decision rightsYou approve standard offers within your delegated limit. Anything above it, or any new partnership, goes to the founder's steering group with a written recommendation.
  • Stage gates for productsIdea → prototype → paid pilot → launch. No launch without paying customers in the pilot.
  • Thresholds & escalationA slip over 2 weeks or a cost change over 5% goes to the steering group in the monthly board report, with options.
  • StandardsAll ten portfolios use the same templates and evidence standards, so the founder can compare them like for like.
Cheatsheet · one image to remember

Module 2 cheatsheet

Module 2 cheatsheet
ZoomHeight

Drag the picture to choose which part shows. Use zoom and height, then Save.

Module 2 · Competency 2.1 · Define and establish the governance modelQ43
Non-calculation

What is the PRIMARY purpose of a portfolio governance model?

Module 2 · Competency 2.1 · Define and establish the governance modelQ44
Non-calculation

An organization's portfolio decisions are slow because nobody knows who can approve what. What should the portfolio manager define?

Module 2 · Competency 2.1 · Define and establish the governance modelQ45
Non-calculation

Which body typically holds FINAL approval authority for selecting and funding portfolio components?

Module 2 · Competency 2.1 · Define and establish the governance modelQ46
Non-calculation

When designing the governance structure, why should the governance model be scaled to the organization?

Module 2 · Competency 2.1 · Define and establish the governance modelQ47
Non-calculation

A multinational wants regional portfolios but consistent oversight. Which governance approach fits BEST?

Module 2 · Competency 2.1 · Define and establish the governance modelQ48
Non-calculation

Which role is MOST responsible for championing the portfolio and its alignment at executive level?

Module 2 · Competency 2.2 · Determine standards, protocols and best practicesQ49
Non-calculation

The portfolio manager wants consistent practices across all components. What should be done?

Module 2 · Competency 2.2 · Determine standards, protocols and best practicesQ50
Non-calculation

Which is the BEST source when setting portfolio standards in an organization with existing practices?

Module 2 · Competency 2.2 · Determine standards, protocols and best practicesQ51
Non-calculation

Component managers report status in different formats, so they cannot be compared. Which governance action fixes this?

Module 2 · Competency 2.2 · Determine standards, protocols and best practicesQ52
Non-calculation

Who should normally approve new portfolio management standards?

Module 2 · Competency 2.2 · Determine standards, protocols and best practicesQ53
Non-calculation

Why is it important to periodically review portfolio standards and protocols?

Module 2 · Competency 2.2 · Determine standards, protocols and best practicesQ54
Non-calculation

A new regulation requires data-privacy reviews for every IT component. How should the portfolio respond?

Module 2 · Competency 2.3 · Define and modify portfolio processesQ55
Non-calculation

Which process ensures that portfolio benefits are defined, planned and tracked from the start?

Module 2 · Competency 2.3 · Define and modify portfolio processesQ56
Non-calculation

A stakeholder asks how a new component idea gets into the portfolio. Which process should be defined and communicated?

Module 2 · Competency 2.3 · Define and modify portfolio processesQ57
Non-calculation

Portfolio change requests are being approved informally in corridor conversations. What should be established?

Module 2 · Competency 2.3 · Define and modify portfolio processesQ58
Non-calculation

Which BEST describes stage-gate (phase-gate) reviews in portfolio governance?

Module 2 · Competency 2.3 · Define and modify portfolio processesQ59
Non-calculation

The portfolio processes are well documented but rarely followed. What should the portfolio manager do FIRST?

Module 2 · Competency 2.3 · Define and modify portfolio processesQ60
Non-calculation

When defining portfolio processes, which processes are MOST closely linked to Governance in The Standard for Portfolio Management?

Module 2 · Competency 2.3 · Define and modify portfolio processesQ61
Calculation · Stage-gate scoring

At a stage gate, a component must score at least 70% of the maximum weighted score to proceed. Criteria weights are 40%, 35% and 25%. The component is rated 4, 3 and 4 out of 5. What is the gate decision?

Module 2 · Competency 2.4 · Create the portfolio management planQ62
Non-calculation

Which document defines roles, escalation paths, tolerances, thresholds and KPIs for managing the portfolio?

Module 2 · Competency 2.4 · Create the portfolio management planQ63
Non-calculation

How does the portfolio management plan relate to the portfolio strategic plan?

Module 2 · Competency 2.4 · Create the portfolio management planQ64
Non-calculation

A component exceeds a cost tolerance set in the portfolio management plan. What should happen?

Module 2 · Competency 2.4 · Create the portfolio management planQ65
Non-calculation

Which is the BEST example of a portfolio-level KPI?

Module 2 · Competency 2.4 · Create the portfolio management planQ66
Non-calculation

Who should review and agree the portfolio management plan before it is put in place?

Module 2 · Competency 2.4 · Create the portfolio management planQ67
Non-calculation

The portfolio management plan was created three years ago and has not been updated. What is the risk?

Module 2 · Competency 2.4 · Create the portfolio management planQ68
Calculation · Escalation threshold

Portfolio governance requires any change request above 5% of a component's approved budget to be escalated to the portfolio governance board. A component with a $12M budget submits a $750,000 change request. What should happen?

Module 2 · Competency 2.5 · Recommend and obtain approval for decisionsQ69
Non-calculation

The portfolio manager has completed the analysis for next year's component mix. What should the portfolio manager do NEXT?

Module 2 · Competency 2.5 · Recommend and obtain approval for decisionsQ70
Non-calculation

Governance approves a component but at 70% of the requested funding. What should the portfolio manager do?

Module 2 · Competency 2.5 · Recommend and obtain approval for decisionsQ71
Non-calculation

What should be done with portfolio decisions once governance makes them?

Module 2 · Competency 2.5 · Recommend and obtain approval for decisionsQ72
Non-calculation

A sponsor bypasses governance and starts a component with their own departmental budget. What should the portfolio manager do?

Module 2 · Competency 2.5 · Recommend and obtain approval for decisionsQ73
Non-calculation

Which BEST describes 'authorizing' a portfolio component?

Module 2 · Competency 2.5 · Recommend and obtain approval for decisionsQ74
Calculation · Funding availability

The approved portfolio budget is $50M. Governance policy holds 10% of the budget as a management reserve, and $38M is already committed to authorized components. How much is available to authorize NEW components?

Module 2 · Competency 2.5 · Recommend and obtain approval for decisionsQ75
Calculation · Portfolio balance

A $50M portfolio has $33M in Run, $12M in Grow and $5M in Transform components. The governance board's balance target is 20% Transform. How much funding must move into Transform to meet the target?

Module 2 · Competency 2.5 · Recommend and obtain approval for decisionsQ76
Calculation · Strategic funding allocation

The governance board allocates a $24M discretionary pool across three strategic objectives weighted 50%, 30% and 20%. How much is allocated to the objective weighted 30%?

Module 3 · 25% of the assessment · 10 competencies

Module 3 · Performance & Value Delivery · 43 Questions

13 calculation and 30 non-calculation questions, in competency order. Start the 85-second timer (board pace), choose your answer, then check the explanation. Calculation answers show every step of the working.

Situational flowSee every Module 3 formula applied to one board decision: Project A’s USD 11M forecast loss.
Study hints · director focus

What a young director must master in Module 3

  • Portfolio performance is about value and benefits from the optimal mix of components, not about how individual projects are doing.
  • Define SMART metrics linked to objectives and use a PMIS to consolidate cost, performance, risk and resource data.
  • Capability and capacity analysis, finite capacity planning and sourcing decisions decide what the organization can really deliver.
  • Roll up earned value by summing EV and AC across components. Never average component CPIs.
  • Issues go to the lowest level with authority; changes that affect the mix, shared resources or other components go through portfolio change control.

Written for the programme from The Standard for Portfolio Management and Royal Sakti practice.

Director notes · at a glance

Module 3: what to remember

Must know

  • Value. Benefits realised against investment, aligned to strategy. Delivering on time is not the same as delivering value.
  • Monitoring. Use the KPIs governance defined, rolled up across components.
  • Capacity. Demand vs supply of people, money and assets. Over 100% means rebalance by priority.
  • Balancing. Risk vs return, short vs long term, run / grow / transform.
  • Issues. Within tolerance: component level. Beyond it: escalate with options and a recommendation.
  • Portfolio change. Assess impact → governance decides → update the roadmap → communicate.
  • Records. Keep approvals, prioritisations and decisions for audit.

Boardroom traps · the right instinct

  • IfAll green, strategy stuck→ You are measuring outputs, not benefits.
  • IfPortfolio CPI→ Σ EV ÷ Σ AC. Never average the component CPIs.
  • IfResource clash→ Decide by agreed priority, not first-come.
  • IfOne-off overrun→ EAC = AC + (BAC − EV), not BAC ÷ CPI.
  • IfTCPI above 1→ The rest of the work must be done more efficiently. Raise feasibility with governance.
CPI = EV ÷ AC · SPI = EV ÷ PVCV = EV − AC · SV = EV − PVEAC = BAC ÷ CPI (typical)EAC = AC + (BAC − EV) (one-off)ETC = EAC − AC · VAC = BAC − EACTCPI = (BAC − EV) ÷ (BAC − AC)Utilisation = Demand ÷ Capacity

Applied · as a Young Director

  • Aggregated KPIRoll your portfolio's value, schedule, risk and people health into one board score the founder can compare across all ten portfolios.
  • Escalation with optionsWhen exposure passes the threshold, bring options (recover, re-baseline, stop) and one recommendation, never just the problem.
  • CapacityYou and your partner are the scarce resource. Plan only what fits your time; everything else waits by priority.
  • Benefits realisationTrack revenue and impact against plan (realised ÷ planned), not the number of activities completed.
Cheatsheet · one image to remember

Module 3 cheatsheet

Module 3 cheatsheet
ZoomHeight

Drag the picture to choose which part shows. Use zoom and height, then Save.

Module 3 · Competency 3.1 · Initiate the portfolioQ77
Non-calculation

Governance has approved the portfolio. What should the portfolio manager use to initiate it?

Module 3 · Competency 3.1 · Initiate the portfolioQ78
Non-calculation

When initiating the portfolio, which activity is MOST important?

Module 3 · Competency 3.1 · Initiate the portfolioQ79
Non-calculation

A component is authorized but its manager has not received the charter or the funding release. What is the issue?

Module 3 · Competency 3.2 · Collect and consolidate KPI dataQ80
Non-calculation

The portfolio manager needs data to judge portfolio health. What should be collected?

Module 3 · Competency 3.2 · Collect and consolidate KPI dataQ81
Non-calculation

Component data comes in late and is often inaccurate. What is the BEST long-term fix?

Module 3 · Competency 3.2 · Collect and consolidate KPI dataQ82
Non-calculation

Which is the BEST reason to consolidate component metrics at portfolio level?

Module 3 · Competency 3.2 · Collect and consolidate KPI dataQ83
Calculation · CPI

A portfolio component reports Earned Value (EV) $4.2M, Actual Cost (AC) $4.8M and Planned Value (PV) $5.0M. What is the Cost Performance Index (CPI)?

Module 3 · Competency 3.2 · Collect and consolidate KPI dataQ84
Calculation · SPI

Using the same component (EV $4.2M, AC $4.8M, PV $5.0M), what is the Schedule Performance Index (SPI), and what does it mean?

Module 3 · Competency 3.2 · Collect and consolidate KPI dataQ85
Calculation · Schedule variance

A component shows EV $4.2M and PV $5.0M. What is the Schedule Variance (SV)?

Module 3 · Competency 3.3 · Monitor portfolio performanceQ86
Non-calculation

Which is the BEST tool for ongoing monitoring of portfolio performance by executives?

Module 3 · Competency 3.3 · Monitor portfolio performanceQ87
Non-calculation

A dashboard shows all components 'green', yet the strategic objectives are not progressing. What is the MOST likely issue?

Module 3 · Competency 3.3 · Monitor portfolio performanceQ88
Non-calculation

Besides formal reports, how should the portfolio manager monitor performance?

Module 3 · Competency 3.3 · Monitor portfolio performanceQ89
Calculation · EAC (typical)

The component has a Budget at Completion (BAC) of $12M and a CPI of 0.875. If current cost performance is expected to continue, what is the Estimate at Completion (EAC)?

Module 3 · Competency 3.3 · Monitor portfolio performanceQ90
Calculation · EAC (atypical)

BAC is $12M, EV is $4.2M and AC is $4.8M. The overrun came from a one-time supplier failure that will not recur, and the remaining work is expected to go to plan. What is the EAC?

Module 3 · Competency 3.3 · Monitor portfolio performanceQ91
Calculation · ETC

The EAC is $13.71M and the Actual Cost to date is $4.8M. What is the Estimate to Complete (ETC)?

Module 3 · Competency 3.3 · Monitor portfolio performanceQ92
Calculation · EAC (CPI × SPI)

A component has BAC $10M, EV $4M, AC $5M and PV $5M. Leadership asks for a forecast in which BOTH cost and schedule performance affect the remaining work. What is the EAC?

Module 3 · Competency 3.4 · Manage and escalate issuesQ93
Non-calculation

A component reports a critical issue that will affect two other components. What should the portfolio manager do?

Module 3 · Competency 3.4 · Manage and escalate issuesQ94
Non-calculation

When escalating an issue to the governance board, what should the portfolio manager provide?

Module 3 · Competency 3.4 · Manage and escalate issuesQ95
Non-calculation

An issue falls within a component's tolerance. Who should resolve it?

Module 3 · Competency 3.4 · Manage and escalate issuesQ96
Calculation · VAC

BAC is $12M and the revised EAC is $13.71M. What is the Variance at Completion (VAC), and how should it be reported?

Module 3 · Competency 3.4 · Manage and escalate issuesQ97
Calculation · TCPI

BAC is $12M, EV is $4.2M and AC is $4.8M. Governance insists the component finish within the original BAC. What To-Complete Performance Index (TCPI) is required?

Module 3 · Competency 3.5 · Manage portfolio changesQ98
Non-calculation

A business unit asks to add a major new component mid-cycle. What should the portfolio manager do FIRST?

Module 3 · Competency 3.5 · Manage portfolio changesQ99
Non-calculation

Which of these is a portfolio-level change rather than a component-level change?

Module 3 · Competency 3.5 · Manage portfolio changesQ100
Non-calculation

Staff resist the portfolio's decision to stop several legacy projects. Which approach helps MOST?

Module 3 · Competency 3.6 · Balance and prioritize componentsQ101
Non-calculation

What does 'balancing the portfolio' mean?

Module 3 · Competency 3.6 · Balance and prioritize componentsQ102
Non-calculation

The portfolio is heavily weighted toward low-risk, short-term operational improvements. What does this suggest?

Module 3 · Competency 3.6 · Balance and prioritize componentsQ103
Non-calculation

While re-prioritizing, the portfolio manager finds a high-priority component is starved of resources by a lower-priority one. What should be done?

Module 3 · Competency 3.7 · Optimize capacity allocationQ104
Non-calculation

What is the PURPOSE of capacity planning in portfolio management?

Module 3 · Competency 3.7 · Optimize capacity allocationQ105
Non-calculation

Demand for data scientists exceeds supply across the portfolio. Which option is NOT an appropriate capacity response?

Module 3 · Competency 3.7 · Optimize capacity allocationQ106
Non-calculation

Capacity in portfolio management includes which of the following?

Module 3 · Competency 3.7 · Optimize capacity allocationQ107
Calculation · Capacity utilization

For next quarter, the components' combined demand for engineering resources is 14,400 hours. Available capacity is 12,000 hours. What is the utilization, and what is the shortfall?

Module 3 · Competency 3.7 · Optimize capacity allocationQ108
Calculation · FTE demand vs supply

Three components need 6.0, 4.5 and 3.5 full-time-equivalent (FTE) data specialists. Only 12 FTE are available. What percentage of demand can be met, and how many FTE are short?

Module 3 · Competency 3.8 · Update and refine the roadmapQ109
Non-calculation

After a major reallocation of resources, what should the portfolio manager update?

Module 3 · Competency 3.8 · Update and refine the roadmapQ110
Non-calculation

A key component is delayed by six months. How should the roadmap update be handled?

Module 3 · Competency 3.8 · Update and refine the roadmapQ111
Non-calculation

Why keep previous versions of the portfolio roadmap?

Module 3 · Competency 3.9 · Measure aggregated performanceQ112
Non-calculation

The board asks whether the portfolio is achieving the strategy. What should the portfolio manager present?

Module 3 · Competency 3.9 · Measure aggregated performanceQ113
Non-calculation

A component finished on time and on budget, but its benefits never materialized. How should this be reflected?

Module 3 · Competency 3.9 · Measure aggregated performanceQ114
Non-calculation

Which measure BEST reflects portfolio value?

Module 3 · Competency 3.9 · Measure aggregated performanceQ115
Calculation · Aggregated CPI

Three components report EV / AC: A $2.0M / $2.5M; B $3.0M / $2.8M; C $1.5M / $1.2M. What is the CORRECT aggregated portfolio CPI?

Module 3 · Competency 3.9 · Measure aggregated performanceQ116
Calculation · Benefits realization

A portfolio's benefits register forecast $8.0M of benefits by the end of the fiscal year. Measured realized benefits are $5.2M. What is the benefits realization rate?

Module 3 · Competency 3.10 · Maintain recordsQ117
Non-calculation

Why must the portfolio manager maintain records of approvals, prioritizations and decisions?

Module 3 · Competency 3.10 · Maintain recordsQ118
Non-calculation

An internal auditor asks why a component was funded over another. Where should the answer come from?

Module 3 · Competency 3.10 · Maintain recordsQ119
Non-calculation

Which is the BEST place to store portfolio artifacts?

Module 4 · 15% of the assessment · 6 competencies

Module 4 · Risk & Capital Protection · 26 Questions

6 calculation and 20 non-calculation questions, in competency order. Start the 85-second timer (board pace), choose your answer, then check the explanation. Calculation answers show every step of the working.

Situational flowSee every Module 4 formula applied to one board decision: Project A’s USD 11M forecast loss.
Study hints · director focus

What a young director must master in Module 4

  • Portfolio risk looks at aggregated, structural, execution, internal and external risk, including risk versus reward across the mix.
  • Risk appetite and thresholds are set by executives and governance; the portfolio manager facilitates and documents them.
  • Dependency analysis reveals concentration and cascading risk. Components that enable many others deserve special attention.
  • Contingency reserve covers identified risks inside components; management reserve covers unknowns at portfolio level and needs governance approval.
  • Everyone should be encouraged to identify risks, and every significant risk needs an owner with the authority to act.

Written for the programme from The Standard for Portfolio Management and Royal Sakti practice.

Director notes · at a glance

Module 4: what to remember

Must know

  • Portfolio risk. Uncertainty that affects portfolio objectives: structural (mix, concentration), component and overall. It covers threats and opportunities.
  • Appetite → tolerance → threshold. Broad willingness → measurable limits → the trigger points.
  • Dependency analysis. Finds risks that cascade from one component to others.
  • Portfolio risk register. Aggregated and strategic risks, each with an owner.
  • EMV. Probability × impact. Threats are negative, opportunities positive.
  • Reserves. Contingency for known risks. Management reserve for unknowns, sized on aggregate risk and approved by governance.
  • Occurred risk. Becomes an issue and goes through issue management.

Boardroom traps · the right instinct

  • IfOnly threats listed→ Opportunities are missing.
  • IfMany small risks, same supplier→ Aggregate them into one portfolio risk.
  • IfIs the response worth it?→ Yes if the EMV reduction is greater than the cost of the response.
  • IfUnclear or contradictory appetite→ Clarify it with governance before selecting components.
  • IfReserve = 10% by habit→ No. Base it on aggregate risk exposure.
EMV = P × INet EV = Σ(P × outcome) − costRisk score = P × I vs thresholdContingency = Σ EMV (known threats)Exposure % = Exposure ÷ Portfolio value

Applied · as a Young Director

  • Concentration riskIf one client brings most of your portfolio's income, open a second channel before it becomes a crisis.
  • Dependency riskThree products sharing one platform or supplier is one portfolio risk, not three. Log it once and give it one owner.
  • Opportunity responseShare upside with clients or partners (success fees, revenue share) to exploit opportunities you cannot capture alone.
  • Zero-tolerance thresholdMissing a contract or regulatory notice deadline loses entitlement. Treat notice dates as red lines.
Cheatsheet · one image to remember

Module 4 cheatsheet

Module 4 cheatsheet
ZoomHeight

Drag the picture to choose which part shows. Use zoom and height, then Save.

Module 4 · Competency 4.1 · Determine acceptable level of riskQ120
Non-calculation

What should the portfolio manager use to determine the acceptable level of risk for the portfolio?

Module 4 · Competency 4.1 · Determine acceptable level of riskQ121
Non-calculation

What is the difference between risk appetite and risk tolerance?

Module 4 · Competency 4.1 · Determine acceptable level of riskQ122
Non-calculation

Executives say they want 'high innovation' but reject every component rated above medium risk. What should the portfolio manager do?

Module 4 · Competency 4.1 · Determine acceptable level of riskQ123
Non-calculation

Why must portfolio risk tolerance be understood BEFORE selecting components?

Module 4 · Competency 4.1 · Determine acceptable level of riskQ124
Calculation · Risk tolerance

Portfolio risk tolerance says no more than 15% of total portfolio value may be exposed to risk. The portfolio is worth $40M and the aggregated risk exposure is $7M. What is the situation?

Module 4 · Competency 4.2 · Develop the risk management planQ125
Non-calculation

Which should be included in the portfolio risk management plan?

Module 4 · Competency 4.2 · Develop the risk management planQ126
Non-calculation

How is portfolio risk management DIFFERENT from project risk management?

Module 4 · Competency 4.2 · Develop the risk management planQ127
Non-calculation

The portfolio risk management plan treats only threats. What is missing?

Module 4 · Competency 4.3 · Perform dependency analysisQ128
Non-calculation

Why perform dependency analysis across portfolio components?

Module 4 · Competency 4.3 · Perform dependency analysisQ129
Non-calculation

Three components depend on the same vendor platform. Which type of risk does this BEST illustrate?

Module 4 · Competency 4.3 · Perform dependency analysisQ130
Non-calculation

Which tool BEST shows the interdependencies between portfolio components?

Module 4 · Competency 4.4 · Maintain the portfolio risk registerQ131
Non-calculation

What should a portfolio-level risk register contain that component registers usually do NOT?

Module 4 · Competency 4.4 · Maintain the portfolio risk registerQ132
Non-calculation

Several components each report a minor risk about the same supplier. What should the portfolio manager do?

Module 4 · Competency 4.4 · Maintain the portfolio risk registerQ133
Non-calculation

How often should the portfolio risk register be reviewed?

Module 4 · Competency 4.4 · Maintain the portfolio risk registerQ134
Non-calculation

A risk listed on the portfolio register has now occurred. What does it become?

Module 4 · Competency 4.4 · Maintain the portfolio risk registerQ135
Calculation · EMV (portfolio net)

The portfolio risk register includes: Threat T1 (30%, −$400,000); Opportunity O1 (20%, +$250,000); Threat T2 (10%, −$600,000). What is the net Expected Monetary Value (EMV) of these risks?

Module 4 · Competency 4.4 · Maintain the portfolio risk registerQ136
Calculation · Decision tree

Option A costs $2M and has a 60% chance of $5M benefit and a 40% chance of $1M benefit. Option B costs $1M and has a 70% chance of $2.5M benefit and a 30% chance of $0.5M benefit. Using expected value, which option should be chosen and what is its net expected value?

Module 4 · Competency 4.4 · Maintain the portfolio risk registerQ137
Calculation · Probability × impact

Risks are scored Probability × Impact on a 0–1 scale, and any score of 0.18 or above is 'High' and must be escalated. Which risk must be escalated? R1 (P 0.3, I 0.5), R2 (P 0.7, I 0.2), R3 (P 0.5, I 0.4), R4 (P 0.9, I 0.1).

Module 4 · Competency 4.4 · Maintain the portfolio risk registerQ138
Calculation · Response cost-benefit

A threat has a 40% probability and a $1,000,000 impact. A mitigation costing $80,000 would cut the probability to 10%. What is the net value of carrying out the mitigation?

Module 4 · Competency 4.5 · Promote risk ownershipQ139
Non-calculation

Component managers see portfolio risks as 'the PMO's problem'. What should the portfolio manager do?

Module 4 · Competency 4.5 · Promote risk ownershipQ140
Non-calculation

Which practice BEST builds risk ownership across the portfolio?

Module 4 · Competency 4.5 · Promote risk ownershipQ141
Non-calculation

Stakeholders interpret 'high risk' differently. What should be done?

Module 4 · Competency 4.6 · Recommend the management reserveQ142
Non-calculation

What is the BASIS for recommending a portfolio management reserve?

Module 4 · Competency 4.6 · Recommend the management reserveQ143
Non-calculation

Who approves use of the portfolio management reserve?

Module 4 · Competency 4.6 · Recommend the management reserveQ144
Non-calculation

What is the difference between contingency reserve and management reserve?

Module 4 · Competency 4.6 · Recommend the management reserveQ145
Calculation · Contingency reserve

Three identified portfolio threats have these probabilities and impacts: 40% / $500,000; 25% / $800,000; 50% / $100,000. If the contingency reserve is set at the total EMV of identified threats, what should it be?

Module 5 · 15% of the assessment · 6 competencies

Module 5 · Stakeholders & Communication · 25 Questions

2 calculation and 23 non-calculation questions, in competency order. Start the 85-second timer (board pace), choose your answer, then check the explanation. Calculation answers show every step of the working.

Situational flowSee every Module 5 formula applied to one board decision: Project A’s USD 11M forecast loss.
Study hints · director focus

What a young director must master in Module 5

  • Portfolio communications exist to meet stakeholders' information needs and to support informed decisions.
  • Stakeholder analysis covers interest, influence, relationships and grouping, usually shown in a stakeholder matrix.
  • Communications requirements analysis decides who needs what, when and how; review for redundant reports and use a communications matrix.
  • Organizational culture shapes channels and formality. Sensitive news goes to the most affected stakeholders personally first.
  • Verify accuracy against source data and the decision log before release; correct errors quickly and fix the root cause.

Written for the programme from The Standard for Portfolio Management and Royal Sakti practice.

Director notes · at a glance

Module 5: what to remember

Must know

  • Start with stakeholders. Analyse first: interviews, surveys, power/interest grid.
  • Communication plan. Who, what, when, how, by whom, aggregated across all components.
  • Tailor it. Executives get concise dashboards and exceptions. Teams get detail.
  • Engage. Proactively, to manage expectations before changes land.
  • Keep it current. New stakeholders, new tools and feedback all trigger an update.
  • Verify before release. Accurate, consistent, complete, from one source of truth.
  • Facilitate understanding. Workshops, guides and coaching on portfolio processes.

Boardroom traps · the right instinct

  • IfStakeholder opposes the roadmap→ Meet them and understand the concern first. Do not escalate first.
  • IfHigh power, low interest→ Keep satisfied.
  • IfTwo reports, two numbers→ Credibility is lost. Fix the source and verify.
  • If“Why wasn’t my project picked?”→ Walk them through the criteria and the process transparently.
  • IfReports too long for executives→ Change format and content, not just frequency.
Channels = n(n − 1) ÷ 2Satisfaction % = Satisfied ÷ Surveyed

Applied · as a Young Director

  • Power/interestMinistries and regulators have high power: keep them satisfied with formal, well-evidenced letters. GLC boards: manage closely with a monthly dashboard.
  • Tailored vehiclesSame message, three formats: a 15-second board hook, a 60-second call and a formal written brief.
  • Single source of truthEvery figure you present must match the portfolio dashboard: one number, one source, everywhere.
  • Verify before releaseReconcile every number with its owner before a board paper goes out.
Cheatsheet · one image to remember

Module 5 cheatsheet

Module 5 cheatsheet
ZoomHeight

Drag the picture to choose which part shows. Use zoom and height, then Save.

Module 5 · Competency 5.1 · Analyze stakeholdersQ146
Non-calculation

Before creating a communication plan, what should the portfolio manager do?

Module 5 · Competency 5.1 · Analyze stakeholdersQ147
Non-calculation

Which technique BEST classifies stakeholders by their level of authority and concern?

Module 5 · Competency 5.1 · Analyze stakeholdersQ148
Non-calculation

An external regulator has high influence but little interest in the portfolio's daily progress. How should they be managed?

Module 5 · Competency 5.1 · Analyze stakeholdersQ149
Non-calculation

Why include external stakeholders in portfolio stakeholder analysis?

Module 5 · Competency 5.2 · Create the communication strategy and planQ150
Non-calculation

What does the aggregate portfolio communication strategy define?

Module 5 · Competency 5.2 · Create the communication strategy and planQ151
Non-calculation

Executives say portfolio reports are too long and detailed. What should be adjusted in the communication plan?

Module 5 · Competency 5.2 · Create the communication strategy and planQ152
Non-calculation

Which is the MOST important consideration when choosing communication vehicles?

Module 5 · Competency 5.2 · Create the communication strategy and planQ153
Non-calculation

How does the portfolio communication plan relate to component communication plans?

Module 5 · Competency 5.2 · Create the communication strategy and planQ154
Calculation · Communication channels

A portfolio has 12 key stakeholders. A merger adds 4 more. By how many do the potential communication channels increase?

Module 5 · Competency 5.3 · Engage stakeholdersQ155
Non-calculation

A key stakeholder is unexpectedly opposing the portfolio roadmap. What should the portfolio manager do FIRST?

Module 5 · Competency 5.3 · Engage stakeholdersQ156
Non-calculation

What is the GOAL of stakeholder engagement in portfolio management?

Module 5 · Competency 5.3 · Engage stakeholdersQ157
Non-calculation

A business unit leader keeps asking for special treatment for their components. Which approach is BEST?

Module 5 · Competency 5.3 · Engage stakeholdersQ158
Non-calculation

Stakeholders were not told about a major portfolio rebalancing until after it happened. What was missed?

Module 5 · Competency 5.4 · Maintain the communication planQ159
Non-calculation

Stakeholder feedback shows the portfolio dashboard is hard to interpret. What should the portfolio manager do?

Module 5 · Competency 5.4 · Maintain the communication planQ160
Non-calculation

How can the portfolio manager judge whether communications are effective?

Module 5 · Competency 5.4 · Maintain the communication planQ161
Non-calculation

The organization adopts a new collaboration platform. What should be done with the portfolio communication plan?

Module 5 · Competency 5.4 · Maintain the communication planQ162
Non-calculation

A new stakeholder group joins after an acquisition. What should happen to the communication plan?

Module 5 · Competency 5.4 · Maintain the communication planQ163
Calculation · Engagement target

A stakeholder survey shows 18 of 24 key stakeholders rate portfolio reporting 'satisfactory or better'. The communications target is 85%. How many MORE stakeholders must be satisfied to meet the target?

Module 5 · Competency 5.5 · Facilitate understanding of processesQ164
Non-calculation

Component managers do not understand the new portfolio intake process. What should the portfolio manager do?

Module 5 · Competency 5.5 · Facilitate understanding of processesQ165
Non-calculation

Which is the BEST way to build shared understanding of portfolio governance across a large organization?

Module 5 · Competency 5.5 · Facilitate understanding of processesQ166
Non-calculation

Why is stakeholder understanding of portfolio processes important?

Module 5 · Competency 5.5 · Facilitate understanding of processesQ167
Non-calculation

A new executive questions why a 'pet project' was not selected. What should the portfolio manager do?

Module 5 · Competency 5.6 · Verify accuracy of communicationsQ168
Non-calculation

Before sending a portfolio status report to the board, what should the portfolio manager do?

Module 5 · Competency 5.6 · Verify accuracy of communicationsQ169
Non-calculation

Two reports show different budget figures for the same component. What is the MOST likely impact?

Module 5 · Competency 5.6 · Verify accuracy of communicationsQ170
Non-calculation

Which practice BEST ensures consistent portfolio communications?

Quick reference

Director's Toolkit · Decision Formulas

Every formula used in the module questions, with the decision rule a board expects you to apply.

Financial selection · Domain 1

MeasureFormulaRule / example
Present valuePV = FV ÷ (1 + r)ⁿ$1M in 3 yrs at 8% = $793,832
Net present valueNPV = Σ PV(inflows) − investmentChoose the highest positive NPV; project length does not matter once discounted
Internal rate of returnIRR = the rate where NPV = 0Accept if IRR > hurdle rate. For mutually exclusive choices, NPV wins
Return on investmentROI = (Benefit − Cost) ÷ Cost$1.8M vs $1.2M → 50%
Benefit-cost ratioBCR = PV benefits ÷ PV costs> 1 adds value; compare value per dollar
Payback periodYears until cumulative inflow = investmentIgnores the time value of money and later cash flows
Opportunity costValue of the BEST option given upNot the sum of all rejected options; ignore sunk cost
Weighted scoreΣ (criterion weight × score)The most-tested portfolio technique

Earned value · Domain 3

MeasureFormulaRule / example
Cost varianceCV = EV − ACNegative = over budget
Schedule varianceSV = EV − PVNegative = behind schedule
Cost performance indexCPI = EV ÷ AC< 1 over budget
Schedule performance indexSPI = EV ÷ PV< 1 behind schedule
EAC: variance will continueEAC = BAC ÷ CPITypical
EAC: variance was one-offEAC = AC + (BAC − EV)Atypical
EAC: cost and schedule both countEAC = AC + (BAC − EV) ÷ (CPI × SPI)Both indices carry forward
Estimate to completeETC = EAC − ACMoney still needed
Variance at completionVAC = BAC − EACNegative = forecast overrun
To-complete indexTCPI = (BAC − EV) ÷ (BAC − AC)> 1 means you must work more efficiently
Portfolio roll-upCPI = ΣEV ÷ ΣACNever average the component indices

Risk · Domain 4

MeasureFormulaRule / example
Expected monetary valueEMV = P × IThreats negative, opportunities positive
Decision treeNet EV = Σ(P × outcome) − costChoose the highest net value
Risk scoreScore = P × ICompare with the threshold in the risk plan
Contingency reserveΣ EMV of identified threatsKnown-unknowns; component level
Management reserveBased on aggregate portfolio riskUnknown-unknowns; governance approves

Capacity & communications · Domains 3 & 5

MeasureFormulaRule / example
UtilizationDemand ÷ Capacity> 100% = over-allocated
Communication channelsn(n − 1) ÷ 212 people → 66 channels
Balance targetTarget % × total − currentSize of the reallocation needed

More formulas used in the questions

MeasureFormulaRule / example
Benefits realization rateRate = Realized benefits ÷ Planned benefits (to date)Below 100% = shortfall; use plan to date mid-year
Funding available for new workAvailable = Budget − Reserve − CommittedHold the reserve back before authorizing new components
Strategic funding allocationAllocation = Pool × Objective weightUSD 24M × 30% = USD 7.2M
Escalation thresholdEscalate if change > threshold (e.g. % of budget)USD 750k vs 5% of USD 12M (600k) → escalate
Risk tolerance checkExposure % = Risk exposure ÷ Portfolio valueCompare with the tolerance limit set by governance
Engagement target gapNeeded = Target % × Total − Current85% × 24 = 20.4 → 21 needed; 21 − 18 = 3 more
Critical ratio (CR)CR = CPI × SPIBelow 1 = cost and schedule both under pressure
Benefit varianceBenefit variance = Realized − PlannedNegative = benefits below target
PERT expected valueE = (O + 4M + P) ÷ 6Three-point estimate: 34, 39, 50 → 40.0
Standard deviation (three-point)σ = (P − O) ÷ 6(50 − 34) ÷ 6 = 2.67
Variance (three-point)Variance = ((P − O) ÷ 6)²2.67² = 7.11
Combined standard deviationσ total = √(Σ σᵢ²)Add variances, not standard deviations
Self-assessment

My Results

Programme bands: Above Target ≥ 80%, Target 65–79%, Below Target 50–64%, Needs Improvement < 50%. Target or better in every module is required to complete the programme.

Assessment timer · 240 minutes

4:00:00

Pace target: about 42 questions per hour.

Calculation vs judgment

Timed conditions

Director Assessment · 3 Full Sets

Three complete 170-question assessments across all five modules: one question at a time, a 240-minute countdown, flag for review, a question navigator, and no answers until you submit. You finish with a Director Assessment Report by module, then review every question with its explanation.

170Questions per set
240Minutes
150Scored
20Unscored pretest
3Full sets · 510 Q

Module blueprint used

ModuleWeightExact sharePer set
M1 · Strategy & Alignment25%42.542–43
M2 · Governance & Board Decisions20%34.034
M3 · Performance & Value Delivery25%42.542–43
M4 · Risk & Capital Protection14%23.824
M5 · Stakeholders & Communication16%27.227
Total100%170170

How the assessment works

Each set mixes all five modules in random order, like a real board agenda. 150 questions are scored and 20 are unscored pilot questions. Every question is original and written in situational style: what should the director do FIRST, NEXT or BEST.

The programme standard is Target or better (65%+) overall and in every module.

Full simulation · Set 1

Director Assessment · Set 1

170 questions · 240 minutes · D1 43 · D2 34 · D3 42 · D4 24 · D5 27 · 19 calculation

Full simulation · Set 2

Director Assessment · Set 2

170 questions · 240 minutes · D1 42 · D2 34 · D3 43 · D4 24 · D5 27 · 20 calculation

Full simulation · Set 3

Director Assessment · Set 3

170 questions · 240 minutes · D1 43 · D2 34 · D3 42 · D4 24 · D5 27 · 19 calculation

Attempt history

Situational flow · one case through all five domains

MPR alert: Project A forecasts a USD 11 million loss. The board needs a decision.

Follow one realistic case from strategy to communication. Each domain applies its formulas to the same numbers, explains what each result means, and ends with the decision the portfolio manager should recommend. All figures are in USD millions and every calculation is worked.

These are the decision formulas a young director is expected to use, grouped by the module where they are applied.

D1
Domain 1 · Strategic Alignment

Is Project A still worth it and still aligned?

Situation. The original business case invested USD 60.0M for benefits of USD 18M, 20M, 22M, 24M and 26M over five years after go-live (total USD 110M), discounted at 10%. The MPR now forecasts a final cost of USD 71.1M. Re-test the investment case at the new cost.

The story · board terms in context

The monthly performance report (MPR) lands on the portfolio manager's desk: Project A, the signalling upgrade, now forecasts a USD 11M overrun. Before anyone asks 'stop or continue?', the portfolio manager goes back to the organizational strategyorganizational strategyThe organization's mission, vision and goals. The portfolio exists to deliver it. and the portfolio strategic planportfolio strategic planTurns organizational strategy into portfolio objectives, priorities and the prioritization model. to confirm Project A still serves an approved objective. The question is strategic alignmentstrategic alignmentHow well a component contributes to approved strategic objectives., not cost alone.

The portfolio charterportfolio charterAuthorizes the portfolio manager and defines the portfolio structure, scope and resources. gives the portfolio manager authority to re-evaluate components, so Project A is re-scored against the prioritization criteriaprioritization criteriaAgreed, weighted factors used to score components (strategic fit, value, risk, dependencies). in the scoring modelscoring modelThe weighted scoring tool that ranks components on the criteria.. The numbers are rerun as what-if scenario analysiswhat-if scenario analysisModels alternative component mixes or events to compare value under constraints.: continue, recover or terminate. Money already spent is a sunk costsunk costMoney already spent that cannot be recovered. and is ignored. What matters is the forward value compared with the opportunity costopportunity costValue of the best alternative given up. of the next best use of funds, and whether the return still clears the hurdle ratehurdle rateMinimum acceptable return; NPV is calculated at this rate..

Because the strategy has not changed but the investment case has, this is not yet manage strategic changemanage strategic changeProcess for adjusting the portfolio when organizational strategy changes.. The portfolio manager still runs a quick gap analysisgap analysisCompares the current state with the desired state. against the portfolio roadmapportfolio roadmapHigh-level, time-based view of components, milestones and dependencies linked to strategy. to see which dependent milestones would move, and a capability and capacity analysiscapability and capacity analysisChecks whether skills and resource volume can deliver the planned portfolio. to check the organization can absorb the recovery.

Key board terms in this step (14) · tap to open
organizational strategyThe organization's mission, vision and goals. The portfolio exists to deliver it.Director trap: start here before judging any component.
portfolio strategic planTurns organizational strategy into portfolio objectives, priorities and the prioritization model.Updated when strategy changes.
strategic alignmentHow well a component contributes to approved strategic objectives.The first test, before cost or schedule.
portfolio charterAuthorizes the portfolio manager and defines the portfolio structure, scope and resources.Compare with the project charter, which authorizes a project.
prioritization criteriaAgreed, weighted factors used to score components (strategic fit, value, risk, dependencies).Set with governance and key stakeholders.
scoring modelThe weighted scoring tool that ranks components on the criteria.Most-tested portfolio technique.
what-if scenario analysisModels alternative component mixes or events to compare value under constraints.Use it before recommending to governance.
sunk costMoney already spent that cannot be recovered.Never a reason to continue.
opportunity costValue of the best alternative given up.Only the best alternative, not all of them.
hurdle rateMinimum acceptable return; NPV is calculated at this rate.Accept if IRR exceeds it.
manage strategic changeProcess for adjusting the portfolio when organizational strategy changes.Uses gap and readiness analysis.
gap analysisCompares the current state with the desired state.Paired with readiness analysis.
portfolio roadmapHigh-level, time-based view of components, milestones and dependencies linked to strategy.A communication tool; not a detailed schedule.
capability and capacity analysisChecks whether skills and resource volume can deliver the planned portfolio.Capacity is often the real constraint.
Study check · a simple investment example USD 100k invested, inflows 40k, 50k and 60k at 10%: ROI 50%, NPV ≈ 22,765, IRR ≈ 21.6%, BCR 1.23, payback 2.17 years. Verified in the working above with the same formulas.
The numbers
MeasureFormulaWorkingResultWhat it tells the board
Present value of benefitsPV = Σ CFt ÷ (1 + r)ᵗ18÷1.1^1 + 20÷1.1^2 + 22÷1.1^3 + 24÷1.1^4 + 26÷1.1^5USD 82.0MBenefits are worth this much in today’s money.
NPV (original)NPV = PV benefits − investment82.0 − 60.0USD 22.0MThe approved case was clearly positive.
NPV (revised)NPV = PV benefits − investment82.0 − 71.1USD 10.9MStill positive, but value fell by about half.
IRRRate where NPV = 0Solve NPV(rate) = 0 at cost 60.0 and 71.122.6% → 15.4%Return still beats the 10% hurdle rate.
ROI (revised)ROI = (Benefits − Cost) ÷ Cost × 100%(110 − 71.1) ÷ 71.154.7%Undiscounted return fell from 83.3%.
BCRBCR = PV benefits ÷ PV costs82.0 ÷ 60.0 → 82.0 ÷ 71.11.37 → 1.15Each USD 1 still returns more than USD 1.
Payback periodYears until cumulative inflow = cost18 + 20 + 22 = 60; (71.1 − 60) ÷ 24 = 0.463.00 → 3.46 yearsCash comes back about 0.5 year later.
Forward-looking value (sunk cost ignored)PV benefits − ETC82.0 − 39.1 (USD 32.0M already spent is sunk)USD 42.8MFinishing is worth far more than stopping.
Opportunity costValue of the best alternative given upProject B could use the same USD 39.1M for NPV USD 15.0MUSD 15.0MContinuing A gives up B’s USD 15M, but A’s forward value is higher.
Weighted score (re-scored)Σ weight × scoreBefore 0.4×5 + 0.3×4 + 0.3×3 = 4.10; now 0.4×5 + 0.3×2 + 0.3×24.10 → 3.20Still above the 3.0 continue line, but weaker.
Decision for the board

Project A remains strategically aligned and financially viable (NPV positive, IRR above hurdle, BCR above 1, best forward value). Do not terminate on the headline loss alone. Re-score it and continue to the governance decision on funding the overrun.

D2
Domain 2 · Governance

Who decides, and is there money to decide with?

Situation. The forecast overrun is USD 11.1M on a USD 60.0M budget. Governance rules: the portfolio manager approves overruns up to 5% of BAC, the portfolio board up to 15%, the executive board above 15%. The USD 200.0M portfolio holds a 10% management reserve and USD 172.0M is committed. Phase 1 planned USD 12.0M of early benefits; USD 9.0M has been realized.

The story · board terms in context

The overrun is 18.5% of budget, and the governance modelgovernance modelStructure, roles, decision rights and processes for portfolio oversight. sets clear decision rightsdecision rightsWhich body or person may approve which decisions.. The portfolio manager may approve up to 5%, the portfolio governance boardportfolio governance boardExecutive body that authorizes, prioritizes, funds and terminates components. up to 15%, and anything higher needs the executive board. This escalation thresholdescalation thresholdLimit above which a decision must go to a higher authority. rule, written in the portfolio management planportfolio management planDescribes how the portfolio is governed and managed, including subsidiary plans., means the portfolio manager's job is to analyse and recommend. The executives decide.

At the stage gatestage gateDecision point where a component is reviewed for go, no-go, change or termination. review, governance looks at the component through portfolio oversightportfolio oversightOngoing governance review of performance, risk and alignment. measures: SPI, CPI and early benefits realizationbenefits realizationDelivery of the outcomes and value the investment was approved for.. Funding the overrun means either drawing on the management reservemanagement reservePortfolio-level funds for unknown risks, released only by governance., which only governance can release, or reprioritizing other components. The decision, its rationale and the conditions attached are captured in the decision logdecision logRecord of decisions, rationale, owners and conditions. and the portfolio process assetsportfolio process assetsPortfolio-specific plans, policies, records and lessons learned. so the choice can be audited later. The portfolio manager also checks compliancecomplianceAdherence to laws, regulations, policies and standards. with procurement rules before any extra contract is let.

Key board terms in this step (12) · tap to open
governance modelStructure, roles, decision rights and processes for portfolio oversight.Defines who decides what.
decision rightsWhich body or person may approve which decisions.The portfolio manager recommends; governance decides.
portfolio governance boardExecutive body that authorizes, prioritizes, funds and terminates components.Also called a portfolio review or investment board.
escalation thresholdLimit above which a decision must go to a higher authority.Read the numbers carefully in every board paper.
portfolio management planDescribes how the portfolio is governed and managed, including subsidiary plans.Includes the governance model, change control and prioritization model.
stage gateDecision point where a component is reviewed for go, no-go, change or termination.Gates use agreed criteria.
portfolio oversightOngoing governance review of performance, risk and alignment.Focuses on exceptions, not task detail.
benefits realizationDelivery of the outcomes and value the investment was approved for.Measured against the benefits plan.
management reservePortfolio-level funds for unknown risks, released only by governance.Not the same as contingency reserve.
decision logRecord of decisions, rationale, owners and conditions.Supports accountability and audit.
portfolio process assetsPortfolio-specific plans, policies, records and lessons learned.Updated by most portfolio processes.
complianceAdherence to laws, regulations, policies and standards.Compliance management sits in the portfolio management plan.
The numbers
MeasureFormulaWorkingResultWhat it tells the board
Overrun as % of BACOverrun ÷ BAC11.1 ÷ 60.018.5%Above 15%, so this is an executive board decision.
Funding availableBudget − reserve − committed200.0 − 20.0 − 172.0USD 8.0MUncommitted funds cannot cover USD 11.1M; reserve or reprioritization is needed.
Schedule variance (SV)SV = EV − PV27.0 − 30.0USD -3.0MBehind plan.
Cost variance (CV)CV = EV − AC27.0 − 32.0USD -5.0MOver budget.
SPISPI = EV ÷ PV27.0 ÷ 30.00.90Progressing at 90% of plan.
CPICPI = EV ÷ AC27.0 ÷ 32.00.84Each USD 1 spent delivers USD 0.84 of value.
Benefit realization %Realized ÷ Planned × 1009.0 ÷ 12.075.0%Early benefits are lagging.
Benefit varianceRealized − Planned9.0 − 12.0USD -3.0MUSD 3M short of the phase 1 promise.
BCR to dateRealized benefits ÷ actual cost9.0 ÷ 32.00.28Too early to judge; use the life-cycle BCR from Domain 1.
ROI to date(Benefits − Cost) ÷ Cost(9.0 − 32.0) ÷ 32.0-71.9%Negative mid-delivery is normal; it is not a reason to stop.
Decision for the board

Escalate to the executive board with options. The portfolio manager recommends; the executive board decides. Funding must come from the management reserve or by deferring lower-priority work, because only USD 8M is uncommitted.

D3
Domain 3 · Portfolio Performance

How bad is the forecast, and what does it do to the portfolio?

Situation. Project A at month 18: BAC USD 60.0M, PV 30.0, EV 27.0, AC 32.0. Projects B (EV 40.0, AC 38.0) and C (EV 18.0, AC 17.0) share the portfolio. Signalling engineers: demand 26 FTE, supply 20. Infrastructure holds USD 128.0M against a 50% target of the USD 200.0M portfolio.

The story · board terms in context

The portfolio manager tests the MPR figures against the performance baselineperformance baselineApproved reference for scope, cost, schedule and benefits. in the PMISPMISPortfolio management information system holding cost, performance, risk and resource data.. Earned valueEarned valueMeasures work performed in money terms to assess cost and schedule performance. shows Project A is behind schedule and over budget, and the forecast is expressed as an EACEACEstimate at completion: the forecast total cost. range rather than one number. Portfolio KPIsKPIsKey performance indicators linked to strategic objectives. combine leading indicatorsleading indicatorsPredict future performance (for example resource availability). (engineer availability, open risks) with lagging indicatorslagging indicatorsConfirm results after the fact (for example cost, benefits). (cost, benefits).

At portfolio level, the roll-up CPI is still close to 1, but Project A's demand for scarce signalling engineers pushes capacitycapacityVolume of resources available over time. past 100%. Under finite capacity planningfinite capacity planningScheduling only within the resources actually available., engineers move from lower-priority work. That triggers portfolio rebalancingportfolio rebalancingAdjusting the component mix to restore alignment, balance and capacity. and an update to the roadmap so the optimal mixoptimal mixComponent set that delivers the most strategic value within constraints. of components is protected. The goal of portfolio optimizationportfolio optimizationMaximizing value from the portfolio under constraints and risk appetite. is maximum strategic value within constraints, not saving every project.

Benefits are tracked through the benefits realization planbenefits realization planDefines benefits, owners, measures, timing and tracking.. The shortfall is logged as a portfolio issue in the issue logissue logPortfolio record of issues, owners, escalation and resolution., and a portfolio value assessmentportfolio value assessmentReview of whether the portfolio is delivering expected value. is scheduled for the next quarterly review.

Key board terms in this step (15) · tap to open
performance baselineApproved reference for scope, cost, schedule and benefits.Variances are measured against it.
PMISPortfolio management information system holding cost, performance, risk and resource data.The single source for consolidation.
Earned valueMeasures work performed in money terms to assess cost and schedule performance.Roll up by summing EV and AC.
EACEstimate at completion: the forecast total cost.Choose the formula that fits the variance cause.
KPIsKey performance indicators linked to strategic objectives.Should be SMART.
leading indicatorsPredict future performance (for example resource availability).Enable early action.
lagging indicatorsConfirm results after the fact (for example cost, benefits).Needed, but too late to prevent problems.
capacityVolume of resources available over time.Utilization above 100% means over-allocation.
finite capacity planningScheduling only within the resources actually available.Avoids over-committing the portfolio.
portfolio rebalancingAdjusting the component mix to restore alignment, balance and capacity.Done through governance.
optimal mixComponent set that delivers the most strategic value within constraints.Not equal numbers per category.
portfolio optimizationMaximizing value from the portfolio under constraints and risk appetite.Value, not utilization, is the goal.
benefits realization planDefines benefits, owners, measures, timing and tracking.Benefits are owned by the business.
issue logPortfolio record of issues, owners, escalation and resolution.Cross-component issues belong here.
portfolio value assessmentReview of whether the portfolio is delivering expected value.Feeds rebalancing decisions.
The numbers
MeasureFormulaWorkingResultWhat it tells the board
Critical ratio (CR)CR = CPI × SPI0.84 × 0.900.76Below 1: cost and schedule are both hurting.
EAC · variance continuesEAC = BAC ÷ CPI60.0 ÷ 0.84USD 71.1MThe “loss of 11 million” in the MPR comes from here.
EAC · one-off varianceEAC = AC + (BAC − EV)32.0 + (60.0 − 27.0)USD 65.0MBest case if the problem never repeats.
EAC · cost and scheduleEAC = AC + (BAC − EV) ÷ (CPI × SPI)32.0 + 33.0 ÷ 0.76USD 75.5MWorst case if the schedule pressure also costs money.
ETCETC = EAC − AC71.1 − 32.0USD 39.1MMoney still needed to finish.
VACVAC = BAC − EAC60.0 − 71.1USD -11.1MForecast overrun reported in the MPR.
TCPI(BAC − EV) ÷ (BAC − AC)33.0 ÷ 28.01.18Finishing within BAC needs 18% better efficiency: unrealistic.
Portfolio CPI (roll-up)ΣEV ÷ ΣAC(27.0 + 40.0 + 18.0) ÷ (32.0 + 38.0 + 17.0)0.98Averaging the three CPIs would show 0.99: never average.
Capacity utilizationDemand ÷ Supply26 ÷ 20130.0%Recovery needs engineers the portfolio does not have.
Balance gapCurrent − Target % × Total128.0 − 0.5 × 200.0USD 28.0M overAdding USD 11M deepens an existing imbalance.
Decision for the board

Report a realistic EAC range of USD 65.0M to 75.5M (most likely 71.1M) instead of promising BAC. Resequence engineers from lower-priority work, and rebalance the infrastructure category if more is spent on A.

D4
Domain 4 · Portfolio Risk Management

What could still go wrong, and how much reserve does that need?

Situation. Remaining risks on A: R1 supplier insolvency (30%, −USD 6M, score P4 × I5), R2 test rework (50%, −USD 2M), O1 software reuse (40%, +USD 1.5M). Three-point estimate of the remaining cost: O 34.0, M 39.0, P 50.0. Remaining work packages have σ of 1.5, 2.0 and 1.2. Options: Recover (crash team USD 4M; 70% chance to save 7M, 30% to save 1M), Re-baseline (accept the overrun), Terminate. Portfolio risk tolerance: exposure no more than 10% of the USD 200M portfolio; existing exposure is USD 16M.

The story · board terms in context

The portfolio manager reads the overrun against the organization's risk appetiterisk appetiteOverall amount and type of risk the organization is willing to pursue., risk tolerancerisk toleranceAcceptable variation around objectives; the degree of risk the organization can withstand. and risk thresholdrisk thresholdMeasured level of exposure that triggers action or escalation.. Project A's supplier problem is a component riskcomponent riskRisk inside one component.. Because three components rely on the same supplier, it is also a structural riskstructural riskRisk from how the portfolio is composed: concentration, dependencies, mix. driven by interdependencyinterdependencyRelationship where one component affects another., which raises the portfolio's aggregated risk exposureaggregated risk exposureCombined risk of all components viewed together..

Each risk in the portfolio risk registerportfolio risk registerRecord of portfolio-level risks, scores, owners and responses. gets a named risk ownerrisk ownerPerson accountable for monitoring and responding to a risk.. Responses are chosen deliberately: mitigatemitigateReduce probability or impact of a threat. supplier failure with a second source, transfertransferShift a threat's impact to a third party (insurance, contract). part of the cost through contract terms, and exploitexploitMake sure an opportunity happens. the software-reuse opportunity. Known risks are funded from the contingency reservecontingency reserveFunds for identified risks, inside component budgets.. Unknown-unknowns remain covered by the management reservemanagement reservePortfolio-level funds for unidentified risks, outside baselines..

The remaining cost is estimated with a three-point estimatethree-point estimateOptimistic, most likely and pessimistic estimates combined (PERT)., and the range could be tested further with Monte Carlo simulationMonte Carlo simulationRepeated random sampling to model the range of outcomes.. Choosing between recover, re-baseline and terminate is a risk-rewardrisk-rewardBalancing potential return against exposure. trade-off, analysed with a decision tree and expected monetary valueexpected monetary valueProbability × impact, summed across outcomes..

Key board terms in this step (18) · tap to open
risk appetiteOverall amount and type of risk the organization is willing to pursue.Set by executives.
risk toleranceAcceptable variation around objectives; the degree of risk the organization can withstand.Applies to worst-case outcomes, not only averages.
risk thresholdMeasured level of exposure that triggers action or escalation.Turns appetite into numbers.
component riskRisk inside one component.Managed by the component unless it affects the portfolio.
structural riskRisk from how the portfolio is composed: concentration, dependencies, mix.A portfolio-level concept.
interdependencyRelationship where one component affects another.Creates cascading risk.
aggregated risk exposureCombined risk of all components viewed together.Can exceed the sum of parts through dependencies.
portfolio risk registerRecord of portfolio-level risks, scores, owners and responses.Not every task risk.
risk ownerPerson accountable for monitoring and responding to a risk.Needs authority to act.
mitigateReduce probability or impact of a threat.Threat response.
transferShift a threat's impact to a third party (insurance, contract).Threat response; risk still exists.
exploitMake sure an opportunity happens.Opportunity response.
contingency reserveFunds for identified risks, inside component budgets.Known-unknowns.
management reservePortfolio-level funds for unidentified risks, outside baselines.Unknown-unknowns; governance approves use.
three-point estimateOptimistic, most likely and pessimistic estimates combined (PERT).E = (O + 4M + P) ÷ 6.
Monte Carlo simulationRepeated random sampling to model the range of outcomes.Shows probability of meeting targets.
risk-rewardBalancing potential return against exposure.Core to portfolio balancing.
expected monetary valueProbability × impact, summed across outcomes.Threats negative, opportunities positive.
The numbers
MeasureFormulaWorkingResultWhat it tells the board
Risk score R1Probability × Impact (1–5 scale)4 × 520Above the threshold of 15: escalate and assign an owner.
EMV R1 / R2 / O1P × Impact0.3 × −6 ; 0.5 × −2 ; 0.4 × +1.5-1.8 ; -1.0 ; +0.6Threats negative, opportunity positive.
Net EMVΣ EMV-1.8 + -1.0 + 0.6USD -2.2MExpected net risk still facing A.
Contingency reserveΣ EMV of identified threats1.8 + 1.0USD 2.8MHold inside A’s budget for known risks.
PERT expected cost(O + 4M + P) ÷ 6(34.0 + 4 × 39.0 + 50.0) ÷ 6USD 40.0MClose to the ETC of 39.1M: the forecast is credible.
Standard deviationσ = (P − O) ÷ 6(50.0 − 34.0) ÷ 6USD 2.67MAbout 68% chance the cost lands within ±2.67M.
Varianceσ²2.67²7.11Used when adding uncertainty across items.
Combined σ (3 packages)√(Σ σᵢ²)√(1.5² + 2.0² + 1.2²) = √7.69USD 2.77MAdd variances, not standard deviations.
Decision tree · RecoverΣ(P × outcome) − cost0.7 × 7 + 0.3 × 1 − 4USD +1.2MBest option: positive expected value.
Decision tree · TerminateLose forward value−(PV benefits − ETC)USD -42.8MStopping destroys the most value.
Risk tolerance checkExposure ÷ Portfolio value(16.0 + 11.1) ÷ 200.013.6%Breaches the 10% tolerance: governance must accept or reduce exposure.
Decision for the board

Approve the Recover option (expected +USD 1.2M). Fund USD 2.8M contingency inside A and draw the overrun from management reserve only with executive approval, because exposure now breaches tolerance. R1 needs a named executive owner.

D5
Domain 5 · Communications Management

Who needs to know, and are they on board?

Situation. The steering group has 9 members; a recovery taskforce adds 5 people. 14 of 20 key stakeholders say they are confident in the recovery plan; the target is 85%. The MPR headline said “USD 11 million loss”.

The story · board terms in context

Bad news travels fast, so the portfolio manager starts with stakeholder analysisstakeholder analysisIdentifying stakeholders and their interest, influence, expectations and relationships.. A power/interest gridpower/interest gridClassifies stakeholders to choose engagement: manage closely, keep satisfied, keep informed, monitor. shows the executive sponsor and the regulator as high-power, high-interest stakeholders to manage closely. The stakeholder engagement assessment matrixstakeholder engagement assessment matrixCompares current and desired engagement levels (unaware, resistant, neutral, supportive, leading). shows two sponsors at 'resistant' when they need to be 'supportive'.

The communications management plancommunications management planDefines who receives what information, when, how and from whom. is updated through communications requirements analysiscommunications requirements analysisDetermines stakeholders' information needs and removes redundant reporting.. The new taskforce is added to the communications matrixcommunications matrixTable mapping audiences to content, channel, frequency and owner.. Executives get a one-page dashboarddashboardConcise visual summary of key portfolio information. (push communication), the team uses the PMISPMISShared system used as a pull source of portfolio information. as a single source of truthsource of truthOne agreed, authoritative data source. (pull communication), and sponsors get an interactive briefing (interactive communication).

Every number is verified against the decision log before release so the message is accurate and transparenttransparentOpen about status, assumptions and decisions.. A feedback loopfeedback loopMechanism to confirm messages are understood and improve communications. checks that stakeholders understood the decision, and the stakeholder registerstakeholder registerRecord of stakeholders, interests, influence and engagement approach. is updated.

Key board terms in this step (12) · tap to open
stakeholder analysisIdentifying stakeholders and their interest, influence, expectations and relationships.Repeat it when the portfolio changes.
power/interest gridClassifies stakeholders to choose engagement: manage closely, keep satisfied, keep informed, monitor.High power and high interest: manage closely.
stakeholder engagement assessment matrixCompares current and desired engagement levels (unaware, resistant, neutral, supportive, leading).Shows where action is needed.
communications management planDefines who receives what information, when, how and from whom.Updated when stakeholders or needs change.
communications requirements analysisDetermines stakeholders' information needs and removes redundant reporting.Feeds the plan.
communications matrixTable mapping audiences to content, channel, frequency and owner.A practical planning tool.
dashboardConcise visual summary of key portfolio information.Executives prefer it to long reports.
PMISShared system used as a pull source of portfolio information.Supports a single source of truth.
source of truthOne agreed, authoritative data source.Prevents conflicting numbers.
transparentOpen about status, assumptions and decisions.Builds trust; bad news early.
feedback loopMechanism to confirm messages are understood and improve communications.Communication is two-way.
stakeholder registerRecord of stakeholders, interests, influence and engagement approach.Living document.
The numbers
MeasureFormulaWorkingResultWhat it tells the board
Communication channels beforen(n − 1) ÷ 29 × 8 ÷ 236Current complexity.
Communication channels aftern(n − 1) ÷ 214 × 13 ÷ 291+55 channels: use a communications matrix and one spokesperson.
Engagement gapTarget % × Total − Current0.85 × 20 = 17; 17 − 143 more stakeholdersTargeted briefings for the three least-confident sponsors.
Accuracy checkReported vs calculatedMPR “11M” vs VAC -11.1M; EAC range 65.0–75.5MConsistentReport the range and assumptions, not one alarming number.
Decision for the board

Brief the most affected sponsors personally before the executive board meeting, then issue one verified message with the EAC range, the chosen option and the next review date. Update the communication plan for the taskforce.

Board resolution · Project A

Continue and recover, with conditions

  1. Strategy (D1): still aligned; NPV USD 10.9M, IRR 15.4%, BCR 1.15. Sunk cost ignored.
  2. Governance (D2): overrun 18.5% of BAC, so the executive board decides. Only USD 8.0M is uncommitted.
  3. Performance (D3): EAC USD 71.1M (range 65.0–75.5M); TCPI 1.18 shows BAC is unachievable. Portfolio CPI 0.98.
  4. Risk (D4): Recover option +USD 1.2M; contingency USD 2.8M; exposure 13.6% breaches tolerance.
  5. Communications (D5): channels 36 → 91; win 3 more stakeholders; report the range, not a single number.